Kelana Jaya LRT operating on single track as repair work still ongoing
Kelana Jaya LRT operating on single track as repair work still ongoing - Hello loyal readers FeedGoogle, In the article you are reading this time with the title Kelana Jaya LRT operating on single track as repair work still ongoing, We have prepared this article well for you to read and take information in it. hopefully the contents of the post Article Malaysians, what we write you can understand. Alright, happy reading.
Title : Kelana Jaya LRT operating on single track as repair work still ongoing
Category : Malaysians
The Kelana Jaya light rail transit (LRT) service is operating using a single track today as repair and installation work between the KLCC and Kampung Baru stations has not been completed yet.Transport Minister Wee Ka Siong said inspection conducted by officers from the Rail Enforcement and Rail Planning division of the Land Public Transport Agency (APAD) at 1.19am until 4.30 am today found that the emergency lane on the right at the liner induction motor (LIM) rail 1447 was unstable.He said the APAD inspection team also ordered the replacement of the damaged linear heat detector sensor cable from tunnel segment 126 up to tunnel segment 96, stretching 28.5 metres, to ensure the fire detection system in the tunnel could work properly, as well as the installation of three rail clips on the rail side.“Rapid Rail has informed that replacement work will be done soon and APAD will co…
That's the article Kelana Jaya LRT operating on single track as repair work still ongoing
You are now reading the article Kelana Jaya LRT operating on single track as repair work still ongoing with link address https://feedgoogle.blogspot.com/2021/05/kelana-jaya-lrt-operating-on-single.html